Movements, certifications and events registered on the platform
Wind tunnel test completed with favorable result for loads of 120 km/h. Technical document available on the portal.
12 Mar 2025 · Materials LaboratoryAssembly completed in 46 hours for a 60 m temporary hangar. Client: agro-industrial logistics operator. Next inspection scheduled.
28 Feb 2025 · Córdoba, ArgentinaIncorporation of polyester fabric with class B-s1,d0 fireproof treatment. Improves safety in industrial environments with machinery.
15 Feb 2025 · Engineering DepartmentInquiries and updates from active projects
Inquiry about anchoring specifications for the HD-40 Dome on sandy soil. They request a load plan and fabric tension.
Subject: Industrial Dome Series HD-40They confirm interest in the HT-60 Hangar for a maintenance base in Comodoro Rivadavia. They request a quote including installation and wind certification for the southern zone.
Subject: Temporary Hangar Series HT-60They require an MP-20 module for temporary storage of supplies during an expansion project. They ask about delivery time and climate control options.
Subject: Multipurpose Inflatable Module Series MP-20Attaches material resistance report for the HD-40 Dome with biaxial tensile tests. Pending client review.
Subject: Technical documentation HD-40Concentrate storage project completed. Installation certificate and maintenance manual were delivered.
Subject: Industrial Dome Series HD-40